1
/
of
11
HOMCOM 8L Hanging Kitchen Bin, Rubbish Bin with Lid & Removable Inner Bucket for Under Cabinet, Under Sink, Office
HOMCOM 8L Hanging Kitchen Bin, Rubbish Bin with Lid & Removable Inner Bucket for Under Cabinet, Under Sink, Office
Regular price
£20.99
Regular price
£25.99
Sale price
£20.99
Unit price
/
per
Taxes included.
Shipping calculated at checkout.
Couldn't load pickup availability
Discover The HOMCOM Kitchen Bin, A Sleek Solution For Any Space. Choose Its Spot: Stand-Alone Or Hung Neatly Over A Kitchen Sink Door. Its 8L Capacity Keeps Areas Tidy While The Stay-Open Lid Feature Enhances Multi-Tasking During Meal Prep. Plus, The Removable Bucket Simplifies Cleanup, Ensuring A Hygienic Space Effortlessly. A Stylish, Space-Saving Kitchen Bin In Brushed Stainless Steel.
Key Features:
-
DUAL PLACEMENT VERSATILITY: Use It as a Free-Standing Rubbish Bin Or Hang It On Kitchen Sink Doors Up To 3 cm Thick. This 8 L Compact Bin Saves Space and Keeps Kitchens, Offices, Bedrooms, Study Rooms, Or Small Areas Neat and Organised
-
STAY-OPEN DESIGN: The Manual Press-to-Open Lid On This Kitchen Bin Stays Open When Needed, Making Meal Prep Easier and Allowing You To Multitask While Keeping Your Countertop Clear and Clutter-free
-
EFFORTLESS INNER BIN CARE: The Removable Bucket Makes Emptying and Cleaning Your Kitchen Bin Easy For Everyone, Preventing Spills and Keeping Your Kitchen Hygienic
-
TIMELESS STAINLESS STEEL ELEGANCE: This Kitchen Bin with Lid Is Made From Brushed 410 Stainless Steel That Resists Fingerprints and Marks, Giving Your Home a Modern, Fresh Look Every Day
- BAG RETENTION RING: The Integrated Ring In This Rubbish Bin Holds Your Trash Bag Firmly In Place, Reducing Mess and Making Daily Chores Quicker and More Convenient
Specifications:
-
Colour: Silver Tone
-
Material: 410 Stainless Steel, PP
-
Overall Dimension: 29.7L x 17.4W x 30H cm
-
Inner Bucket Size: 23.5L x 14W x 27.5H cm
-
Capacity: 8 L
-
Maximum Lid Opening Height: 45 cm
-
Maximum Door Thickness: 3 cm(for Hook)
- Item Label: 851-059V00SR
Package Includes:
- 1 x Kitchen Bin
- 1 x Manual
Share
